Pricing
Confidential Feasibility Assessment
Short answer
A written report that tells you whether to legalize, remove or sell, with preliminary cost ranges and a step-by-step plan. Three tiers from $550. Nothing is filed with the city until you decide.
Choose how deep we go
Every tier starts with the same confidential analysis. The difference is whose eyes review it and how deep they look.
Choosing the wrong path costs tens of thousands. Knowing your path costs $550. And you can't pick wrong: every tier credits toward the next.
Tier 1
Preliminary Assessment
$550
Remote. Report in 12 days from completed intake
- Path classification: AB 2533 amnesty, as-built permit, or removal
- Step by step action plan covering what to do and in what order
- The economics of legalizing versus removing, so you see which exit is smarter
- Realistic preliminary cost ranges for your path
- Open items that can only be verified on site
- A 15-minute call to walk through your report, or written Q&A if you prefer
Most popular
Tier 2
Engineer-Reviewed Assessment
$850
Remote. Report in 12 days from completed intake
- Everything in the Preliminary Assessment
- Independent desk review of your materials by a licensed engineer
- A clear read on whether your path holds from an engineering standpoint
- Engineering red flags plus exactly what must be verified on site
- A 15-minute call to walk through your report, or written Q&A if you prefer
Tier 3
On-Site Engineering Assessment
$1,650Zone 1
Site visit and report within 12 days of completed intake
- Everything in the Engineer-Reviewed Assessment
- Site visit and full walk-through by a licensed engineer
- Joint report with the engineer's findings built into your action plan
- Groundwork that carries into plans and permitting if you choose legalization, with our partners or any engineer you choose
- A 15-minute call to walk through your report, or written Q&A if you prefer
On-site pricing varies by travel zone. Addresses outside the zones get a custom invoice on request.
No pressure, in writing
48 hours to change your mind
A full refund counted to the hour, whether or not you have already started the intake.
Work starts after your refund window closes
Nothing begins until the 48-hour period ends. No rush, no pressure.
Upgrade and pay only the difference
Upgrade to any tier within 5 days of receiving your results and you only pay the difference.
Every figure is preliminary
Final costs are set by the contractor you choose and by what the city approves.
City deadline? Case already in enforcement?
The standard tracks above are not built for enforcement clocks. Urgent cases run on their own terms and their own pricing. Tell us where you stand, or call (747) 351-0050.
Start the urgent reviewOne process from payment to final sign-off
Pay and intake
15 to 60 min
Instant email with your intake link. Your address carries over from checkout, so nothing is entered twice.
Assessment
1 to 2 weeks
Which path applies, what it costs, and how long it takes, delivered as a written PDF report by email.
Plans and permits
2 to 3 weeks
As-built plans are prepared and the application moves through the city with our partners or yours.
Inspection and sign-off
Ongoing
Corrections completed, inspections passed, and the unit is legal on record.
Frequently asked questions
Which tier should I start with?
Start with Preliminary to learn your path and your numbers. Add the engineer's desk review if the structure is older, self-built, or showing visible defects. Book the site visit when the stakes are high or the city is already asking questions.
Will the city know I had it assessed?
No. An assessment is an analysis of your property and documents. Nothing is filed with the city until you decide to proceed. For pre-2020 units, the right to a private third-party inspection before applying is written into Government Code §66311.7.
What does the engineer's opinion cover?
The engineer gives an independent professional opinion on the structure as it stands. It informs your decision, while the final permit call always belongs to the city. Structural plans, drawings, and calculations are a separate service.
I'm buying, not selling. Can I order one before I own the property?
Yes. You do not need to own the property yet. If you close later, your Preliminary fee counts toward any tier for 12 months after closing.
Who does the construction if I legalize?
Permit Amnesty handles the assessment. If you move forward, you can use our licensed contractor partners or any licensed contractor you choose. You are free to take your report elsewhere.