Legalization

Legalize unpermitted work in Los Angeles

Short answer

A qualifying ADU, JADU or garage conversion finished before January 1, 2020 can be permitted under AB 2533, judged on basic health and safety instead of current code. Plain room additions and anything built after the cutoff go through a standard as-built permit. The first step is finding out which track your property is on.

Line drawing of a detached garage with the converted former door opening outlined in dashes

Start with what you have

All legalization guides

Looking for something else? Browse all guides.

Frequently asked questions

How much does a garage conversion permit cost in Los Angeles?

It depends on the size and value of the work, so the city has no single price. Expect plan check and permit fees, as-built plans, and the cost of required corrections. For a conversion finished before 2020 that qualifies under AB 2533, impact and connection charges are waived and replacement parking cannot be required. Garage conversion guide.

Are unpermitted additions grandfathered in California?

No. Age alone does not make unpermitted work legal, and the violation stays with the property when it sells. The closest thing to grandfathering is AB 2533, and it only covers ADUs and JADUs built before January 1, 2020. A room addition that simply enlarged the house still needs a retroactive permit. Room additions explained.

What is a retroactive (as-built) permit?

It is a permit for work that is already built. You submit plans of what exists, inspectors check it, and anything that falls short of current code gets corrected. Inspectors can ask to open finished walls to see the framing, wiring and plumbing behind them.

What are as-built plans, and who prepares them?

As-built plans are measured drawings of the structure as it stands today: floor plan, site plan with setbacks, and elevations. A designer, architect or engineer prepares them. They are required for both AB 2533 and standard retroactive applications.

Can a JADU be legalized under AB 2533?

Yes, if it was built before January 1, 2020. A JADU is up to 500 square feet inside the existing home, which can include an attached garage. A detached converted garage is usually legalized as a regular ADU instead.

Confidential Feasibility Assessment

Find out which track your property is on

Send us the basics. We tell you whether AB 2533, a standard as-built permit or removal fits your property, and what each one realistically costs.

  • Nothing is filed with the city until you decide
  • Three tiers from $550, each credits toward the next
  • A written plan with preliminary cost ranges

Prefer to talk? (747) 351-0050Mon to Fri, 7am to 5pm

Tell us about the property

Deadline cases run on their own track and pricing. Add the date from the notice so we can tell you right away what is realistic.

Confidential. We reply the same or next business day.